Inspeclr Academyالعربية

Professional reports

Signing a report, and revisions

2 min read

When an inspection is finished, open its report and tap Sign off. You sign as the inspector, and so does everyone the template names (a site manager, a witness); a name marked Required must sign before the report can be. With no names in the template, the client may sign too.

Sign and lock locks the report for good: its answers, notes and photos can no longer change, and the printed report carries every signature with its name, title, and the day and time it was signed.

Correcting a signed report

Tap New revision. A copy opens as revision 1, with the same reference, answers and photos, for you to correct, finish and sign again. Revision 0 stays exactly as it was signed, and its report says that a newer revision exists.

Next: Corrective actions

Open Inspeclr